County of San Joaquin (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredNone
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
Existing Systems,Trenching
How Many Plansets Required
2
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Wet Stamps Required
None
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category B

Snow Load
0
Snow Load Notes

N/A

Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

Standard

Minimum Ground On Roof
#10

Electrical

AC Disconnect Required
Yes
Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,PV Breaker,Load Side Taps,Line Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96

Battery / ESS

Unique Battery Placards Needed
1
ESS Notes

No ESS disco [a past project] When the ESS is located more than 5 feet from the connected equipment or passes through a wall there shall be a disconnecting means provided at the ESS, and a manual pull handle disconnect located outside. [Araujo, Josue. DCR 052319] Stand-alone systems (battery backup) shall have a permanent plaque on the exterior of the building or structure at a readily visible location. The plaque shall indicate the location of the system disconnecting means, and that the structure contains a stand-alone electrical power system. [Martinez, Grace & Timothy - 5662 Prospectors Parkway. DCR 121620] As of 2/7/19, MID added new standards for SLD and placards for ESS devices. [a past project. DCR 022219]

Separate ESS Disconnect Required
Local Disconnect,ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

ALL JOBS: All structures on property to be labeled Do not round system size on plans EXISTING SYSTEMS: Provide module type and quantity as well as inverter type and quantity

EV CHARGER: Any project that includes an EV Charger will be required to have a separate set of plans showing EV Charger only EXAMPLE

Electrical Diagram

MPUs require spec sheets and model number to be listed on plans

Custom Placards Required
1
Placards Notes

Battery projects (MID) extra placards required - see Azah, Beryl

Ground mount

Ground Mount Fencing Required
No
Ground Mount Notes

AHJ Environmental Health Dept. is requesting -the plans get revised to show the accurate location for the wells and the septic -location of existing septic -location of the 100% septic replacement area attached onsite water waste form and septic document


environmental health records search: EnvironmentalHealth - Laserfiche WebLink

Setback Front Yard
30
Setback Back Yard
10
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the County of San Joaquin (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.