County of Stanislaus (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Existing Systems,Trenching,Trenching
- How Many Plansets Required
- 3
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- None
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Pathways must be over supported roof structure meaning setbacks start at a load bearing wall
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
PE Requirements; SE digital stamps on structural pages & PE Letter / S. Calcs. WS 110 MPH
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,Load Side Taps,PV Breaker,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 1
- ESS Notes
No ESS (Energy Storage System) disco [a past project] When the ESS is located more than 5 feet from the connected equipment or passes through a wall there shall be a disconnecting means provided at the ESS, and a manual pull handle disconnect located outside. [Araujo, Josue. DCR 052319] Stand-alone systems (battery backup) shall have a permanent plaque on the exterior of the building or structure at a readily visible location. The plaque shall indicate the location of the system disconnecting means, and that the structure contains a stand-alone electrical power system. [Martinez, Grace & Timothy - 5662 Prospectors Parkway. DCR 121620] As of 2/7/19, MID added new standards for SLD and placards for ESS devices. [a past project. DCR 022219]
- Separate ESS Disconnect Required
- Local Disconnect,ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
- Electrical Diagram
- Electrical Diagram Notes
When utilizing sum of all breakers rule - add note:
"WARNING: EQUIPMENT FED BY MULTIPLE SOURCES,
TOTAL RATING OF ALL OVERCURRENT DEVICES
EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE
SHAL NOT EXCEED AMPACITY OF BUSBAR"
- Custom Placards Required
- 1
- Non Standard Revision Requirements
Detailed submission letter required that describes all changes made to the plans. If revising plans post-permit submission, the letter must include all changes made since the original plans were approved.
Ground mount
- Ground Mount Fencing Required
- No
- Ground Mount Notes
11-5-18 - Spoke to Mike a plan checker, and he said they do not require fences around a ground mount. - JH