State of California - Manufactured Housing (HCD) (Riverside) (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Electrical,Digital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
3
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
1

Stamps

Ee Stamp Required On SLD
Yes - 10kW+
Wet Stamps Required
Digital Electrical,Digital Structural
Structural Calculations Required
Yes
Ee Stamp Notes

Required for projects over 10kW

Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category C

Snow Load
0
Snow Load Notes

N/A

Reducible Snow Load Allowed
0
Max Attachment Spacing
96
Structural Notes

Calcs MUST show

  • Rafter Size
  • Embedment screw depth
  • Number of modules on each mounting plane
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Line Side Taps,PV Breaker,Meter Adapter,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91
BOS Restrictions

Standard


Utility meter cannot be underneath the patio cover

Battery / ESS

Unique Battery Placards Needed
1
ESS Notes

Battery system must be shown on placard.


ESS disconnect required within line of sight of ESS on same wall and not blocked by walls/gates/etc

Separate ESS Disconnect Required
Local Disconnect,ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

All Jobs - Structural calculations need to show 3/4" minimum embedment depth penetration, Module count needs to be shown Structural calculations


All HCD Riverside jobs are NOT solar app qualified

Attachment Detail


Attachment Detail Notes

ALL JOBS [3/4" MINIMUM EMBEDMENT DEPTH PENETRATING]

Electrical Diagram

EE stamps required on projects over 10kW

Custom Placards Required
1

Ground mount

Ground Mount Fencing Required
Situational
Ground Mount Notes

Ground Mounts: Fencing requirements will be based on city jurisdiction rules. If in a park, no more than 75% of the lot can be covered with the mobile home and all accessory structures. When demonstrating the path of the trenching, use a dark color. Light greys do not show up when printed and the AHJ will reject the plans for it being missing. Depict and dimension septic tank and disposal field locations

Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the State of California - Manufactured Housing (HCD) (Riverside) (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.