Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Fort Morgan (CO)

Colorado Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2017
SolarAPP+ StatusTargeted
Fire Setback Enforced0

Codes

NEC Code Version
2017
Code List

2015 INTERNATIONAL BUILDING CODE

2015 INTERNATIONAL RESIDENTIAL CODE

2015 EXISTING BUILDING CODE

2015 INTERNATIONAL FIRE CODE

2018 INTERNATIONAL PLUMBING CODE

2015 INTERNATIONAL MECHANICAL CODE

2018 INTERNATIONAL FUEL GAS CODE

2017 NATIONAL ELECTRICAL CODE

2018 INTERNATIONAL ENERGY CONSERVATION CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
Revision Required
0
New Planset Required For Module Swap
0

Fire setbacks

Fire Setback Enforced
0
Setback Notes
Standard

Structural & loads

Wind Speed
115
Wind Notes

Exposure Category C

Snow Load
30
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Line Side Taps,Meter Adapter,PV Breaker,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes
Standard
Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Electrical Diagram
Standard

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Fort Morgan (CO) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.