Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL RESIDENTIAL CODE
2021 INTERNATIONAL EXISTING BUILDING CODE
2021 INTERNATIONAL FIRE CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL PLUMBING CODE
2021 INTERNATIONAL FUEL GAS CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL PROPERTY MAINTENANCE CODE
2021 INTERNATIONAL SWIMMING POOL AND SPA CODE
2023 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 1
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 1
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 130
- Wind Notes
Exposure Category C The Adopted wind speed for Northglenn is 130 MPH (add 3 sec gust to letter & calcs as well)
- Snow Load
- 30
- Snow Load Notes
* Roof snow load is 30 PSF (letter & calcs must also state non-reducible).
- Reducible Snow Load Allowed
- 0
- Max Attachment Spacing
- 96
- Structural Notes
SE digital stamps on corresponding PV pages & PE Letter / Calcs. WS: 130mph. Exposure C. SL: 30psf Revised structural calcs/PE letter required for mod swaps, layout changes, etc. Structural information: o Size, type, and spacing of roof framing members o Type and thickness of roof sheathing o Type and number of layers or roofing materials o Include plans for changes (if any) being made to the existing structure to accommodate the additional dead load. * The Adopted wind speed for Northglenn is 130 MPH (add 3 sec gust to letter & calcs as well), Exposure B. * Engineering must indicate 2018 Edition of the I-codes * Roof snow load is 30 PSF (letter & calcs must also state non-reducible).
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,Meter Adapter,Line Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Building Department - City of Northglenn (http://cms7.revize.com/revize/northglennco/government/departments/building/) Wind speed 110 mph 3-second gust, exposure B designer shall assess The city contracts its building division services through SAFEbuilt (http://www.safebuilt.com/). It's very easy to get a hold of their Building Department with this number . Mounting/ Racking system details including the following: Indicate the mount type (ie: roof-mount, flush mount, grid-tied, etc.) Manufacturer specifications with uplift capacity that meet the wind loads (110 mph, 3-second gusts), snow loads (30 psf), attachment details (type, size, and spacing of fasteners) Colorado stamped engineer's verification letter for any custom racking.
- Electrical Diagram
**All Jobs** * Provide documentation that the AC Disconnect switch is rated for service use. * If using a DC disconnect, provide documentation that the disconnect is rated for DC voltage and what the maximum voltage is. * If there is no main breaker and the 120% rule is not being used, provide load calculations with all loads including PV shown to ensure sum of all OCPDs are below 125A. **Taps** * For line side tap, please reflect that the neutral is not bonded to ground in fused AC disconnect.
- Label Page
Labels page must mention "UV resistant Label Tape required for values on DC and AC Disconnects"
- Custom Placards Required
- 0
- Non Standard Revision Requirements
Revisions shall be clouded in a color other than red or black and shall be clearly labeled with the delta letter or number. The delta shall be shown in the "Revisions" table." (UNDERNEATH THE SYSTEM INFORMATION BLOCK)
Ground mount
- Ground Mount Fencing Required
- No