Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Wheat Ridge (CO)

Colorado Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusPiloting
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2024 International Building Code (IBC), excluding Chapter 1

2024 International Residential Code (IRC), excluding Chapter 1 and with the following appendices: BB, BE, BF, BO, CA, CB, CC, CE, CF, and CH

2024 International Fuel Gas Code (IFGC), excluding Chapter 1 but retaining Section 102

2024 International Mechanical Code (IMC), excluding Chapter 1 but retaining Section 102

2024 International Plumbing Code (IPC), excluding Chapters 1 and 14 but retaining Section 102

2024 International Energy Conservation Code (IECC), excluding Chapter 1 but retaining Sections C102, R102, C107, and R107

2024 International Existing Building Code (IEBC), excluding Chapter 1 

2024 Swimming Pool and Spa Code (ISPSC), excluding Chapter 1 but retaining Sections 102 and 111

2024 International Private Sewage Disposal Code (IPSDC), excluding Chapter 1

2024 International Property Maintenance Code (IMPC), excluding Chapter 1 but retaining Section 102

2024 International Fire Code (IFC), excluding Chapter 1 but retaining Section 105 and adopting the following appendices: B, C, D, F, H, O 

2023 National Electric Code, latest edition adopted by the Colorado State Electrical Board

Accessible and Usable Buildings and Facilities standard (ICC/ANSI A117.1)

Colorado Model Electric Ready and Solar Ready Code

Colorado Model Low Energy and Carbon Code, excluding Chapter 1 but retaining Sections C102, R102, C107, and R107

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Piloting
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
Existing Systems,Trenching
How Many Plansets Required
1
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
135
Wind Notes

* Vult = 135 mph Vasd = 105 mph , 3 sec gust

Snow Load
30
Snow Load Notes

* 30 Lbs. Sq. Ft., 30 Lbs. Drift

Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

**Structural Integrity: All projects, both residential and commercial, must have a documented and stamped letter from a licensed structural engineer in the State of Colorado, indicating that the existing structure has been reviewed and can adequately support all PV systems and meet all current applicable code requirements. If additional structural enhancements are required, detailed structural drawings and/or structural enhancements outlined in a report must be signed and sealed by a structural engineer and submitted with the permit.** **If structural enhancements are required for a commercial project, signed and sealed drawings must be logged in for a structural review. A separate permit will be issued for this work.** ** ** **SE digital stamps on corresponding PV pages & PE Letter / Calcs.**

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Load Side Taps,Meter Adapter,Line Side Taps,PV Breaker
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

STANDARD

Roof Plan

Details showing how the panels will be mounted. Calculations performed by a Colorado registered professional engineer must be submitted to substantiate that the structure can support the design loads specified in Chapter 16 of the International Building Code (IBC). Details and calculations for the panel connections to the roof must be included

Electrical Diagram

Over 10 kW AHJ requires EE stamps Electrical line diagram: **City of Wheat Ridge now requires us to:** **Add notes to ELD:** **-verify cold water bond**

Electrical Diagram Notes

**Cold water bond to gas pipe on customer side of gas meter** **(2) ground rods, unless connected to building Ufer**

Custom Placards Required
0

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Wheat Ridge (CO) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.