County of Douglas (CO)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2021 INTERNATIONAL RESIDENTIAL CODE
2018 INTERNATIONAL ENERGY CONSERVATION CODE WILDFIRE MITIGATION STANDARDS
2018 INTERNATIONAL FIRE CODE
2023 NATIONAL ELECTRICAL CODE
- IEBC Accepted
- 0
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 1
- Revision Required
- 1
- Rough Inspection
- Rough Electrical
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category C
- Snow Load
- 999
- Snow Load Notes
*** Ground Snow Load = Roof Snow Load, _reductions for Snow Loads are not allowed._** Snow Loads are determined according to elevation: Snow Loads are determined according to elevation: ELEVATION RANGES (Feet) SNOW LOAD (PSF) 5152 - 5999 ft 30psf 6000 - 6499 ft 35psf 6500 - 6999 ft 40psf 7000 - 7499 ft 45psf 7500 - 7999 ft 50psf 8000 - 8499 ft 55psf 8500 - 8999 ft 60psf 9000 - 9499 ft 65psf 9500+ ft 70psf
- Reducible Snow Load Allowed
- 0
- Max Attachment Spacing
- 96
- Structural Notes
Other than a Dwelling Unit, an electrical engineer’s signature and the seal is required for any photovoltaic (PV) system to be installed. A structural engineer’s signature and the seal is required for PV modules to be installed. If the letter states that the trusses need to be structurally reinforced to handle the additional weight then a **Building Permit** (https://www.douglas.co.us/documents/building-permit-application.pdf) is required, if no reinforcing is required then a **Building Permit** (https://www.douglas.co.us/documents/building-permit-application.pdf) can be submitted and only electrical inspections will be performed. Weight Roof Framing: Please provide by the Structure Engineer. * Dead Load * Snow load * Wind speed 115 mph, 3-second gust, exposure C * Type of hardware to attach Modules/Racks SE/EE digital stamps on corresponding PV pages & PE Letter / Calcs.
Make sure "IEBC" is removed from the structural analysis letter
Manually Remove the Seismic rating from the first page of the structural analysis letter.
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,Meter Adapter,Load Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
No published information about battery placement. Mays, Jovan. AHJ: City of Lakewood (CO). Equipment in garage no longer required. [DCR 122820] Battery and inverter are supposed to be inside the garage. [DCR 083120] PM required for projects over 10kW-DC. Call out STEEL PRODUCTION METER, 120/240V 3-WIRE . Install a brass tag that says PV PROD and the house number but not the whole address. For example, if the address is 6200 West Mexico Avenue, the brass tag should say PV PROD 6200 .
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
CALL OUT ALL FENCES ON PROPERTY
All equipment must be called out on site plan, including pedestal. Manufacturer's specs for
ALL PV equipment, including listing, nameplate short-circuit current (Isc) and open-circuit voltage (Voc) for modules, and direct current (DC) listing for fuses and circuit breakers used in DC circuits.
NOTE: Fuses and circuit breakers listed for use in Automobile, Marine, or telecom applications are NOT acceptable.
USE STANDARD AMBIENT TEMPERATURE CORRECTION FACTOR WHICH IS EITHER .96 OR 1.00 DERATE PER APPROVED PLANS FROM AHJ
If using the ecofasten smart slides attachment, Add the direct-to-deck mounting engineering letter for eco-fasten slides. (LOCATED IN THE FILES SECTION OF DATABASE)
Add SFM UL2703 cert and RockIt installation guide pages referencing grounding and bonding and compatibility with PV modules.
- Site
If the UM is within 3' of an AC Unit. Meter Upgrade and Relocation is required
- Attachment Detail
Include spec sheets showing module compatibility
- Electrical Diagram
TLD and SLD both required. Indoor taps shall comply with 240.21 and may not exceed 25’. Minimum EGC #6 CU for load side tap. 250.122.
- Label Page
EcoFasten spec sheet for Direct-to-Deck application.
- Custom Placards Required
- 1
- Non Standard Planset Requirements
- Single Line Diagram
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim
- Ground Mount Notes
Setback requirements vary by lot. Contact Zoning for specific setback requirements. Ground screws allowed with engineering. Freeze/Thaw depth: 3' Gravel Base not needed.