County of Teller (CO)
NEC Code Version2023
Wet Stamps RequiredDigital Structural
Fire Setback Enforced0
Codes
- NEC Code Version
- 2023
- Code List
2023 NATIONAL ELECTRICAL CODE
2021 INTERNATIONAL RESIDENTIAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 1
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 0
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category C
- Snow Load
- 40
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Meter Adapter,Line Side Taps,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 1
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Electrical Diagram
Standard
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- No
- Ground Mount Notes
Setback requirements vary by zone. Call the Planning Dept for the specific setbacks. staff Zoning Regulations: Freeze/Thaw Depth: 30" Ground Screws allowed with engineering. No gravel base. Array must be at least 25' from floodplain Septic documentation requires Permit Research from the Building Dept.