Town of Akron (CO)

Colorado Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Wet Stamps RequiredNone
Fire Setback Enforced0

Codes

NEC Code Version
2023
Code List

2009 INTERNATIONAL BUILDING CODE

2009 INTERNATIONAL RESIDENTIAL CODE

2009 INTERNATIONAL MECHANICAL CODE

2009 INTERNATIONAL PLUMBING CODE

2009 INTERNATIONAL FUEL GAS COD

2009 INTERNATIONAL ENERGY CONSERVATION CODE

2009 INTERNATIONAL EXISTING BUILDING CODE

2009 INTERNATIONAL SWIMMING POOL AND SPA CODE

2023 NATIONAL ELECTRICAL CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

Revision Required
0
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
None
Structural Calculations Required
No

Fire setbacks

Fire Setback Enforced
0
Setback Notes

Standard

Structural & loads

Wind Speed
110
Snow Load
30
Snow Load Notes

* Ground Snow: 20 * Roof Snow: 30

Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Line Side Taps,Load Side Taps,PV Breaker,Meter Adapter
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Electrical Diagram

Electrical permit required through the state. Please refer to the State of Colorado (DORA) (CO) for electrical requirements

Custom Placards Required
0

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Town of Akron (CO) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.