Town of Parker (CO)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2021 PARKER ADMINISTRATIVE CODE
2021 INTERNATIONAL EXISTING BUILDING CODE
2021 INTERNATIONAL FIRE CODE
2021 INTERNATIONAL FUEL GAS CODE
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 NON-RESIDENTIAL PROPERTY MAINTENANCE CODE
2021 INTERNATIONAL PLUMBING CODE
2021 INTERNATIONAL RESIDENTIAL CODE
2021 SWIMMING POOL AND SPA CODE
2023 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 1
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 1
Stamps
- Ee Stamp Required On SLD
- Yes - Derate,Yes - MPU
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category C
- Snow Load
- 30
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
* Please Include lag screw connection calculations on structural calcs, and indicate lag screw size and embedment depth based on manufacturer specs. Please include lag screw size and embedment in attachment detail section of plans as well. * Structural letter needs to reflect limited lag embedment and whatever approved upgrade/fix there will be for all lags installed on hip roofs where attachment will be to sleeper purlins instead of structural truss system. This will need to be reflected in plan set as well on details.
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,Meter Adapter,Load Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
A Battery system in the garage will need to comply with 2021 IRC section R328 requirements (need bollards, interconnected heat/smoke detectors, labeling)
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Add Module Compatibility Page to plans. Add SFM railless UL2703 cert for SFM projects to plans. Please provide the manufacturer's listing for the feeder taps for verification of compliance with NEC 230.46. Please Include lag screw connection calculations on structural calcs, and indicate lag screw size and embedment depth based on manufacturer specs. Please include lag screw size and embedment in attachment detail section of plans as well. Structural letter needs to reflect limited lag embedment and whatever approved upgrade/fix there will be for all lags installed on hip roofs where attachment will be to sleeper purlins instead of structural truss system. This will need to be reflected in plan set as well on details.
- Electrical Diagram
* For line side tap, please show bonding within fusible disconnect and if using a GEC/EGC combo, must irreversibly connect to existing grounding electrode system or install GEC from fusible disconnect and irreversibly connect to existing grounding electrode system outside of main electrical panel enclosure. (see Ochoa a past project)
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim