Town of Georgetown (DE)

Delaware Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2017
Wet Stamps RequiredNone
Fire Setback Enforced0

Codes

NEC Code Version
2017
Code List

2012 INTERNATIONAL BUILDING CODE

2012 INTERNATIONAL RESIDENTIAL CODE

2012 INTERNATIONAL ENERGY CONSERVATION CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

Revision Required
0
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
None
Structural Calculations Required
No

Fire setbacks

Fire Setback Enforced
0
Setback Notes

Confirmed setbacks are not enforced

Structural & loads

Wind Speed
115
Wind Notes

Exposure Category B

Snow Load
20
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,Line Side Taps,PV Breaker,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Electrical Diagram

Additional disconnect needed at the MSP when the MSP is interior

Ground mount

Ground Mount Fencing Required
No
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Town of Georgetown (DE) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.