City of Auburndale (FL)
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2023 8TH EDITION FLORIDA BUILDING CODE: BUILDING
2023 8TH EDITION FLORIDA BUILDING CODE: RESIDENTIAL
2023 8TH EDITION FLORIDA BUILDING CODE: MECHANICAL
2023 8TH EDITION FLORIDA BUILDING CODE: PLUMBING
2023 8TH EDITION FLORIDA BUILDING CODE: FUEL GAS
2023 8TH EDITION FLORIDA BUILDING CODE: ENERGY CONSERVATION
2023 8TH EDITION FLORIDA BUILDING CODE: EXISTING BUILDING
2023 8TH EDITION FLORIDA BUILDING CODE: ACCESSIBILITY
2023 8TH EDITION FLORIDA FIRE PREVENTION CODE (NFPA)
2020 NATIONAL ELECTRIC CODE (NEC)
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 2
- Revision Required
- 1
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Ee Stamp Notes
Digitally Verified Signature
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Ridge Setback
- 3
- Rake Setback
- 3
- Hip Valley Setback
- 1
- Setback Notes
Provide fire department setbacks/roof access pathway and point of access. Access points must not be over an egress/emergency escape window. Access pathways are 18β from valleys, 3β from ridge, 3 βfrom edge of roof. Fire Department access pathways are one 3β wide pathway adjacent to panels on hip roofs, two 3β wide pathways adjacent to panels on single ridge roofs. Panes shall not be higher than 3β below the ridge for all roofs and shall be 18β from any valley. FFPC 11.12.2.2.2.1 (11.12 NFPA 70)
Structural & loads
- Wind Speed
- 145
- Wind Notes
Exposure Category C ; HVHZ
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 48
- Structural Notes
PE Reqs ; SE/ EE digital stamps on all corresponding PV pages, FL Statute & PE Letter / Calcs. WS 145 MPH
Digitally Verified Signature
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,Line Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Roof Plan Notes
Layout subject to change
- Electrical Diagram
Standard
- Electrical Diagram Notes
Interconnection Method subject to change
- Custom Placards Required
- 0
- Placards Notes
TECO placard required on AC disco switch
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim