Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Melbourne (FL)

Florida Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2020
Fire Code Version2018 Building Code
SolarAPP+ StatusNot accepted
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced1

Codes

NEC Code Version
2020
Fire Code Version
2018 Building Code
Code List

2023 8TH EDITION FLORIDA BUILDING CODE: BUILDING

2023 8TH EDITION FLORIDA BUILDING CODE: RESIDENTIAL

2023 8TH EDITION FLORIDA BUILDING CODE: MECHANICAL

2023 8TH EDITION FLORIDA BUILDING CODE: PLUMBING

2023 8TH EDITION FLORIDA BUILDING CODE: FUEL GAS

2023 8TH EDITION FLORIDA BUILDING CODE: ENERGY CONSERVATION

2023 8TH EDITION FLORIDA BUILDING CODE: EXISTING BUILDING

2023 8TH EDITION FLORIDA BUILDING CODE: ACCESSIBILITY

2023 8TH EDITION FLORIDA FIRE PREVENTION CODE (NFPA)

2020 NATIONAL ELECTRIC CODE (NEC)

ASCE Code Specification
ASCE 7-22

SolarAPP+ & submittal

SolarAPP+ Status
Not accepted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
Other (See Submission Notes)
Revision Required
0
Rough Inspection
Rough Electrical
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Digital Structural,Digital Electrical
Structural Calculations Required
Yes
Ee Stamp Notes

Digitally Verified Signature

Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard modified setbacks are ok. Portrait orientation only (Landscape is not allowed)

Structural & loads

Wind Speed
151
Wind Notes

Exposure Category C ; HVHZ

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
48
Structural Notes

SE / EE digital stamps on all PV pages, FL Statute & PE Letter / Calcs. WS 150 MPH Show compliance with FBC R905.17.1. Design uplift pressures in component and cladding pressure zones 1 and 2 exceed module design uplift pressure rating.

Digitally Verified Signature

Minimum Ground On Roof
#10

Electrical

AC Disconnect Required
Yes
Electrical Load Calcs Required
Derates
Allowed POI
Line Side Taps,Load Side Taps,PV Breaker
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96
BOS Restrictions

Line Side Taps

Show compliance with NEC 230.46. Pressure connectors and devices for splices and taps installed on service conductors shall be marked “Suitable for use on the line side of the service equipment” or equivalent. The only insulation piercing connector that is certified for use on the line side of the service equipment is the ILSCO IPC-250-4/0. Submit manufacturer specification sheet for line-side connector which is listed suitable for the use.

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

Modules cannot be installed over vents

All projects must provide wind zones per ASCE 7-22

See WindZone clarification ---> ARTICLE

Cover Page


Site Notes

EXAMPLE PROJECT ----> EXAMPLE

Roof Plan Notes

All Jobs [Modules shall not be installed over plumbing vent terminals. Plumbing vent terminals shall project a minimum of 6" above the roof surface. FBC Residential R301.1 Compliant]

Attachment Detail

Comp Shingle ----> add note "Bostik NOA" and NOA found in files

Tile Roof ----> add note "GAF NOA" and NOA found in files

Attachment Detail Notes

Max rail overhang 33% of attachment spacing

Electrical Diagram

LST, EGC must be separate from other conductors (use FL LST blocks)

All sub panels require main breaker

POLARIS PLUGS ONLY!

Electrical Diagram Notes

All Jobs [THE POWER SOURCE OUTPUT BREAKER MUST BE PLACED AT THE “OPPOSITE END” OF THE INTERIOR LOAD CENTER BUSBAR WHERE THE SERVICE DISCONNECTING MEANS IS EQUIPPED WITH FEED-THROUGH CONDUCTORS IN ORDER TO COMPLY WITH NEC 705.12(B)(2)(3)(B). IF THE CONNECTION IS MADE TO THE BUSBAR OF A PANELBOARD THAT SUPPLIES LUGS CONNECTED TO FEED-THROUGH CONDUCTORS AN ADDITIONAL OCPD SHALL BE INSTALLED ON THE LOAD-SIDE OF THE POWER SOURCE OUTPUT CONNECTION TO LIMIT THE CURRENT ON THE FEEDER CONDUCTORS AND INTERIOR PANEL SUPPLIED BY FEED-THROUGH CONDUCTORS]

Label Page

FLORIDA - 2020 EMERGENCY

Custom Placards Required
0

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Melbourne (FL) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.