City of Pompano Beach (FL)
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2023 8TH EDITION FLORIDA BUILDING CODE: BUILDING
2023 8TH EDITION FLORIDA BUILDING CODE: RESIDENTIAL
2023 8TH EDITION FLORIDA BUILDING CODE: MECHANICAL
2023 8TH EDITION FLORIDA BUILDING CODE: PLUMBING
2023 8TH EDITION FLORIDA BUILDING CODE: FUEL GAS
2023 8TH EDITION FLORIDA BUILDING CODE: ENERGY CONSERVATION
2023 8TH EDITION FLORIDA BUILDING CODE: EXISTING BUILDING
2023 8TH EDITION FLORIDA BUILDING CODE: ACCESSIBILITY
2023 8TH EDITION FLORIDA FIRE PREVENTION CODE (NFPA)
2020 NATIONAL ELECTRIC CODE (NEC)
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 1
- Revision Required
- 1
- Rough Inspection
- Footing inspection
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Ee Stamp Notes
SE / EE digital stamps on all PV pages, PE Letter / Calcs & FL Statute.
Engineering letter must specifically "make a positive statement that the existing roof is capable of carrying the new loads from the proposed roof mount solar PV system."
Digitally Verified Signature
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Structural & loads
- Wind Speed
- 170
- Wind Notes
Exposure Category D ; HVHZ
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Stamp Tech Instructions: * Aside from plans and site audit report, please make sure to send Pompano Beach Special Inspector Form (FBC 2023 8th Edition) and Electronic Signature affidavit. * Request that PE provide the SIF (Special Inspection Form) and LOI (Letter of Intent) PE Instructions: * SE / EE digital stamps on all PV pages, PE Letter / Calcs & FL Statute. WS 170 MPH Pompano Beach Special Inspector Form. Electronic Signature affidavit needed for each engineer. * Per the Special Inspection Form, we are required to provide an inspection schedule stating the specific inspection that will be made and at what phase of construction ****(See _ _Letter of Intent - Signed__ in the file section for reference)**** * PE to deliver SEPARATE stamped PV pages.
Digitally Verified Signature
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Load Side Taps,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
- Standard
- Provide spec sheet for all equipment being installed including BLP panel
- Add not about backup loads and where they are coming from
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
APPROVED PLANSET UPLOADED FOR CORRECT REFERENCE
Provide the manufacture cut sheets indicating the UL standard for all equipment intended to be installed
- Roof Plan
- Attachment Detail
2' max attachment spacing
- Attachment Detail Notes
All Jobs [Wind speed - 170 mph // exposure D]
- Electrical Diagram
Taps
- Piercing taps NOT ALLOWED
- Use Polaris taps
Add NG Bond to AC disconnect.
Show NG Bond in MSP.
- Label Page
FLORIDA 2020 CAD BLOCK
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim