Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of West Park (FL)

Florida Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2020
Fire Code Version2018 Building Code
Wet Stamps RequiredWet Structural,Wet Electrical
Fire Setback Enforced1

Codes

NEC Code Version
2020
Fire Code Version
2018 Building Code
Code List

2023 8TH EDITION FLORIDA BUILDING CODE: BUILDING

2023 8TH EDITION FLORIDA BUILDING CODE: RESIDENTIAL

2023 8TH EDITION FLORIDA BUILDING CODE: MECHANICAL

2023 8TH EDITION FLORIDA BUILDING CODE: PLUMBING

2023 8TH EDITION FLORIDA BUILDING CODE: FUEL GAS

2023 8TH EDITION FLORIDA BUILDING CODE: ENERGY CONSERVATION

2023 8TH EDITION FLORIDA BUILDING CODE: EXISTING BUILDING

2023 8TH EDITION FLORIDA BUILDING CODE: ACCESSIBILITY

2023 8TH EDITION FLORIDA FIRE PREVENTION CODE (NFPA)

2020 NATIONAL ELECTRIC CODE (NEC)

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
2
Revision Required
1
Rough Inspection
Racking Inspection
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Wet Structural,Wet Electrical
Structural Calculations Required
Yes
Ee Stamp Notes

This AHJ does not accept stamped signature. Wet signature required

Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
165
Wind Notes

Exposure Category C ; HVHZ

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

The AHJ requires wet plans. Digital signed and sealed plans are not an option for the AHJ.

Signed and sealed plans to the branch, along with the SIF, Structural Calculations, and PE letter.


This AHJ does not accept stamped signature. Wet signature required

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Load Side Taps,Line Side Taps,PV Breaker
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Electrical Diagram

Taps

  • Do not list piercing taps for line side tap connections. The only fitting we can use for line side taps in these AHJs are insulated Polaris taps. 
Label Page Notes

2/19/25:

  • Provide a permanent plaque or directory, denoting the location of each power source disconnecting means for the building, per 11.12.2.1.4.4. 2. On the plaque or directory, provide the wording CAUTION: MULTIPLE SOURCES OF POWER; per 11.12.2.1.4.5 and NFPA 70 �?? Article 705.10. 3. [Remove the existing CAD template text and replace with the AHJ required text.]
  • For the plaque or directory, posted diagrams shall be correctly oriented with respect to the diagram's location; if posted on the West side of the building, north should be oriented to the Left, (Panels should be located at the bottom of the diagram per 11.12.2.1.4.6 and NFPA 70 [Placard will be posted on equipment, use Aurora to help determine new north direction when the building is rotated for the equipment to face the bottom of the placard]
Custom Placards Required
1

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of West Park (FL) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.