Florida Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2020
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced1

Codes

NEC Code Version
2020
Fire Code Version
2018 Building Code
Code List

2023 8TH EDITION FLORIDA BUILDING CODE: BUILDING

2023 8TH EDITION FLORIDA BUILDING CODE: RESIDENTIAL

2023 8TH EDITION FLORIDA BUILDING CODE: MECHANICAL

2023 8TH EDITION FLORIDA BUILDING CODE: PLUMBING

2023 8TH EDITION FLORIDA BUILDING CODE: FUEL GAS

2023 8TH EDITION FLORIDA BUILDING CODE: ENERGY CONSERVATION

2023 8TH EDITION FLORIDA BUILDING CODE: EXISTING BUILDING

2023 8TH EDITION FLORIDA BUILDING CODE: ACCESSIBILITY

2023 8TH EDITION FLORIDA FIRE PREVENTION CODE (NFPA)

2020 NATIONAL ELECTRIC CODE (NEC)

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
Revision Required
1
New Planset Required For Module Swap
1

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Digital Structural,Digital Electrical
Structural Calculations Required
Yes
Ee Stamp Notes

Digital stamps on all PV pages 1-7a. Verifiable digital signatures on all stamps.

This text needs to show on all digital stamps, "Printed copies of this document are not considered signed and sealed and the signatures must be verified on any electronic copies."

ONLY stamps verified by 3rd party such as DigiCert, IdenTrust, GlobalSign, Entrust, Symantec(owned by Digicert) and Notarius. NOT ACCEPTED are Adobe/DocuSign/or SealPact.

Digitally Verified Signature

Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
150
Wind Notes

Exposure Category C

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
48
Structural Notes

Digital stamps on all PV pages 1-7a. Verifiable digital signatures on all stamps.

Manual Stamping required:

This text needs to show on all digital stamps, "Printed copies of this document are not considered signed and sealed and the signatures must be verified on any electronic copies."

ONLY stamps verified by 3rd party such as DigiCert, IdenTrust, GlobalSign, Entrust, Symantec(owned by Digicert) and Notarius. NOT ACCEPTED are Adobe/DocuSign/or SealPact.

Digitally Verified Signature

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Line Side Taps,PV Breaker,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

ESS Elevation Detail Required
No

Plan set

Roof Plan

Include the attachment locations for the racking system overlayed with the modules on the roof plan - MUST SHOW ATTACHMENTS ON PLANSET (Including rafters)

Roof Plan Notes

All Jobs [Layout subject to change]

Electrical Diagram

SHOW SPD ON SLD

Electrical Diagram Notes

All Jobs [Interconnection Method subject to change]

Label Page

FLORIDA 2020 CAD BLOCK

Custom Placards Required
1

Ground mount

Ground Mount Fencing Required
Mesh/Scrim