County of Osceola (FL)
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2023 8TH EDITION FLORIDA BUILDING CODE: BUILDING
2023 8TH EDITION FLORIDA BUILDING CODE: RESIDENTIAL
2023 8TH EDITION FLORIDA BUILDING CODE: MECHANICAL
2023 8TH EDITION FLORIDA BUILDING CODE: PLUMBING
2023 8TH EDITION FLORIDA BUILDING CODE: FUEL GAS
2023 8TH EDITION FLORIDA BUILDING CODE: ENERGY CONSERVATION
2023 8TH EDITION FLORIDA BUILDING CODE: EXISTING BUILDING
2023 8TH EDITION FLORIDA BUILDING CODE: ACCESSIBILITY
2023 8TH EDITION FLORIDA FIRE PREVENTION CODE (NFPA)
2020 NATIONAL ELECTRIC CODE (NEC)
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- Other (See Submission Notes)
- Revision Required
- 1
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Ee Stamp Notes
Digitally Verified Signature
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
AHJ ENFORCES 33%. DOUBLE CHECK FIRESETBACK TO 33% COVERAGE
Structural & loads
- Wind Speed
- 145
- Wind Notes
Exposure Category C ; HVHZ
- Snow Load
- 0
- Reducible Snow Load Allowed
- 0
- Max Attachment Spacing
- 48
- Structural Notes
SEPERATE PLANS
Flatten PV Plans PDF / remove layers before sending to PE. Organize Plans in a zip folder, separated stamped plans pages plus combined unstamped plans pages. SE / EE digital stamps on all corresponding PV pages, FL Statute & PE Letter / Calcs. Please deliver stamped plans pages separated. Digitally Verified Signature
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Line Side Taps,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Show the attachment points on the roof plan overlayed with the panels
Provide the installation manual for the racking system.
- Roof Plan Notes
- Attachment Detail
- Attachment Detail Notes
All Jobs [Roof penetrations shall be flashed and sealed]
- Electrical Diagram
Centerfed 120%: EE Stamp Required AHJ enforces opposite end of busbar rule
INCLUDE ALL ELECTRICAL EQUIPMENT AND WIRE SIZES TO MATCH ONSITE CONDITIONS
- Electrical Diagram Notes
Existing Systems [BOTH PV BACKFEED BREAKERS SHALL BE TOGETHER AT THE END OF THE BUSBAR OPPOSITE TO THE MAIN BREAKER]
- Label Page
FLORIDA 2020 CAD BLOCK
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim
- Ground Mount Notes
- septic system and leach field must be drawn to scale
- provide distance from septic/leach to GM arrays
- trench inspection - can leave pot hotles
- The solar panels and supporting framework shall not extend more than six (6) feet above the existing grade.
- The panels shall be mounted as close as possible to the ground to match the slope of the hillside while allowing adequate drainage and preventing vegetation from shading the panels.
- Reflection angles from collector surfaces shall be oriented away from neighboring windows.
- If the solar panels are visible from off-site, there shall be appropriate façades, walls, fences or landscaping to screen the solar panels and supporting framework from view. Landscaping shall not be applicable to roof mounted solar panels.