County of Pinellas (FL)

Florida Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2020
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced1

Codes

NEC Code Version
2020
Fire Code Version
2018 Building Code
Code List

2023 8TH EDITION FLORIDA BUILDING CODE: BUILDING

2023 8TH EDITION FLORIDA BUILDING CODE: RESIDENTIAL

2023 8TH EDITION FLORIDA BUILDING CODE: MECHANICAL

2023 8TH EDITION FLORIDA BUILDING CODE: PLUMBING

2023 8TH EDITION FLORIDA BUILDING CODE: FUEL GAS

2023 8TH EDITION FLORIDA BUILDING CODE: ENERGY CONSERVATION

2023 8TH EDITION FLORIDA BUILDING CODE: EXISTING BUILDING

2023 8TH EDITION FLORIDA BUILDING CODE: ACCESSIBILITY

2023 8TH EDITION FLORIDA FIRE PREVENTION CODE (NFPA)

2020 NATIONAL ELECTRIC CODE (NEC)

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
Storage Systems,MPU,Derate
How Many Plansets Required
2
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
1

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Digital Structural,Digital Electrical
Structural Calculations Required
Yes
Ee Stamp Notes

FL statute

Digitally Verified Signature

Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
145
Wind Notes

Exposure Category C

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
48
Structural Notes

PE letter/PE calcs

Digitally Verified Signature

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates,Load Relocation
Allowed POI
PV Breaker,Line Side Taps,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

702.4 Guidance

  • AHJ Enforcing NEC 702.4 (Optional Standby Systems) for ESS Will require us to only backup essential loads whose total demand does not exceed what the # of Batteries can provide E.g., 1x Tesla PW can export 20.8A, and so the total load demand in backup cannot exceed 20.8A as shown on planset load calculations (standard and optional acceptable). 
  • Option 1: 702.4(B) EMS or Load Management Hardware Exception can be used in NEC 2020/2023 as to allow maximum capable backup loads (I.E.-SPAN). 
  • Option 2: 220.87(1) Exception: Load Calculation based on Utility Meter Demand Data (Green Button - 15 min Interval over a 30 day period.) 
  • Option 3: Load Calculations via Emporia Energy Monitoring (30 Day Period) 
  • Option 4: Downsize loads
Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

WHEN DOING A WHOLE HOME BACKUP CONFIGURATION FOR TESLA BATTERIES WE NEED LOAD CALCULALIONS TO PROVE WE ARE NO EXCEEDING THE TESLA GATEWAY CAPACITY

Roof Plan Notes

All Jobs [Layout subject to change.]

Electrical Diagram Notes

All Jobs [Interconnection Method subject to change]

Label Page

FLORIDA - 2020

Custom Placards Required
1
Placards Notes

If Tampa electric, please see utility database for placard requirements.

TECO - Tampa Electric Company

Non Standard Revision Requirements

Add Change in Panel Type Count and layout and make sure all pages are clouded. AHJ wants clear, exact wording of what changed, rather than phrases such as "slight layout change".

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the County of Pinellas (FL) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.