Village of Pinecrest (FL)

Florida Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2020
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced1

Codes

NEC Code Version
2020
Fire Code Version
2018 Building Code
Code List

2023 8TH EDITION FLORIDA BUILDING CODE: BUILDING

2023 8TH EDITION FLORIDA BUILDING CODE: RESIDENTIAL

2023 8TH EDITION FLORIDA BUILDING CODE: MECHANICAL

2023 8TH EDITION FLORIDA BUILDING CODE: PLUMBING

2023 8TH EDITION FLORIDA BUILDING CODE: FUEL GAS

2023 8TH EDITION FLORIDA BUILDING CODE: ENERGY CONSERVATION

2023 8TH EDITION FLORIDA BUILDING CODE: EXISTING BUILDING

2023 8TH EDITION FLORIDA BUILDING CODE: ACCESSIBILITY

2023 8TH EDITION FLORIDA FIRE PREVENTION CODE (NFPA)

2020 NATIONAL ELECTRIC CODE (NEC)

IEBC Accepted
1
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

Revision Required
1
Rough Inspection
Rough Electrical
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Digital Structural,Digital Electrical
Structural Calculations Required
Yes
Ee Stamp Notes

Digitally Verified Signature

Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
105
Wind Notes

Plan required to address HVHZ wind pressures HIGH-VELOCITY HURRICANE ZONE (HVHZ) PV REQUIREMENTS Buildings and structures located within the high-velocity hurricane zone shall comply with the provisions of Sections 1605, 1607, 1611, 1616 through 1626. The High Velocity Hurricane Zone (HVHZ) consists of Miami-Dade and Broward Counties. Sections 1512 through 1525 set forth the minimum requirements for the installation of roofing components, roofing systems and roofing assemblies and the waterproofing there of.

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
48
Structural Notes

SIF required: needs to be digitally signed and sealed

Digitally Verified Signature

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
PV Breaker,Line Side Taps,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Attachment Detail

Show entire framing plan with attachment locations. Calculate wind pressure on panels, as per ASCE 7-16, 29.4.3 or 29.4.4 as applicable. Calculate withdrawal (uplift) load at each connector. Verify connector capacity > actual withdrawal load.

Ground mount

Ground Mount Fencing Required
Mesh/Scrim