County of Fayette (GA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2018 INTERNATIONAL BUILDING CODE 2018 INTERNATIONAL RESIDENTIAL CODE 2018 INTERNATIONAL FIRE CODE 2018 INTERNATIONAL PLUMBING CODE 2018 INTERNATIONAL MECHANICAL CODE 2018 INTERNATIONAL FUEL GAS CODE 2023 NATIONAL ELECTRICAL CODE 2015 INTERNATIONAL ENERGY CONSERVATION CODE 2018 INTERNATIONAL SWIMMING POOL AND SPA CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- Other (See Submission Notes)
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Structural Calculations Required
- Yes
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 90
- Wind Notes
Exposure Category B
- Snow Load
- 5
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
6/21/2021 - 1st try-SE digital stamps on corresponding PV pages & PE Letter / Calcs.
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- All Jobs
- Allowed POI
- Load Side Taps,PV Breaker,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Electrical Diagram
ELECTRICAL SYSTEM Indicate the following: Location and sizes of all panels and service equipment. Electrical schematic page not required. Provide electrical calculations for all new electrical systems and modifications to existing systems (Optional for Residential Only). For modifications to existing systems, load calculations shall demonstrate that the new loads will not overload the existing service. Refer to the latest version of state adopted mandatory National Electrical Code®️ (NEC), Article 220 and Annex D for residential instructions and example calculations. A “Dwelling Electrical Calculation” worksheet is available from the FCPID, but is limited single dwellings units having the total connected load served by a single 120/240-volt, 3-wire service with an ampacity of 100 or greater. OTHER REQUIREMENTS Structural Calculations: Structural calculations are required only where structural elements, components or systems exceed the prescriptive provisions of the code. o Engineered roof truss, TJI, and web-truss floor designs are only required to be on-site at time of framing inspection. o Engineered design for tall walls, braced wall lines, garage portals, etc. are required to be submitted for review and approved previous to framing inspection. Energy Code Compliance: An approved method for providing compliance to the latest version of state adopted mandatory IECC Energy Code and Georgia amendments shall be provided. The three approved methods of compliance are Prescriptive, REScheck™️ or Performance. In addition, a permanent Georgia Energy Code Compliance certificate shall be readily accessible and posted on or near the electrical distribution panel or air handler. The certificate shall detail amongst other things the type and efficiency of heating, cooling and water heating equipment along with the calculated heating loads, sensible cooling load, latent cooling load and cfm for space conditioning. The certificate shall be completed by the builder or registered design professional.
- Label Page
Provide manufacturer installation manual for solar panels, Spec sheets alone are not sufficient.
- Custom Placards Required
- 1
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim