City of Murtaugh (ID)
NEC Code Version2017
Fire Code Version2018 Building Code
Wet Stamps RequiredNone
Fire Setback Enforced1
Codes
- NEC Code Version
- 2017
- Fire Code Version
- 2018 Building Code
- Code List
2018 INTERNATIONAL BUILDING CODE 2020 IDAHO ENERGY CONSERVATION CODE 2018 INTERNATIONAL ENERGY CONSERVATION CODE WITH IDAHO AMENDMENTS 2018 IDAHO RESIDENTIAL CODE 2012 INTERNATIONAL RESIDENTIAL CODE PARTS I, II, III AND IX WITH IDAHO AMENDMENTS 2018 INTERNATIONAL EXISTING BUILDING CODE 2018 INTERNATIONAL FIRE CODE 2018 INTERNATIONAL FUEL GAS CODE 2018 INTERNATIONAL MECHANICAL CODE 2017 NATIONAL ELECTRIC CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- None
- Structural Calculations Required
- No
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 90
- Wind Notes
3 sec gust
- Snow Load
- 30
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
- Structural engineering is required if the loads being added to the structure risk compromising the existing structure's integrity.
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Meter Adapter,Line Side Taps,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- No
- Ground Mount Notes
Residential setbacks are 70' from the front lot line. There can be exceptions if there are special use, right-of-way, or easements. Clarify how the transition from PVC to EMT is being done in compliant with NEC 358.6, and 352.6. Clarify how transition will be compliant with NEC 250.96(A).
- Setback Back Yard
- 10
- Setback Side Yard
- 15