Illinois Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2014
Fire Code Version2015 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced1

Codes

NEC Code Version
2014
Fire Code Version
2015 Building Code
Code List

2015 INTERNATIONAL BUILDING CODE

2015 INTERNATIONAL ENERGY CONSERVATION CODE

2015 INTERNATIONAL FIRE CODE

2015 INTERNATIONAL SOLAR ENERGY PROVISIONS AND ORDINANCE 2015 INTERNATIONAL RESIDENTIAL BUILDING CODE

2021 ILLINOISE ENERGY CONSERVATION CODE

2015 INTERNATIONAL SOLAR ENERGY PROVISIONS, AND ORDINANCE" 2014 NATIONAL ELECTRICAL CODE

IEBC Accepted
1
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
1
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Digital Structural,Digital Electrical
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Ridge Setback
3
Rake Setback
3
Setback Notes

2015 IRC/IBC needs 3' fire setbacks

A 36โ€™โ€™ fire access is required on both sides of a solar array on each individual roof plane. A 36โ€™โ€™ fire access pathway is

required on both sides of the roof ridge. An 18โ€™โ€™ fire access pathway is required on each side of all hip and valleys.

There shall not be any doorways or windows directly under the fire access pathways

Structural & loads

Wind Speed
115
Wind Notes

Exposure Category B

Snow Load
30
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes
  • PE Instructions:
  • SE / EE digital stamps on all corresponding PV pages 1-7a. Digitally stamped PE Calcs Letter. WS 115 MPH GSL 30 PSF
  • PE MUST NOT INCLUDE ANY OF THE FOLLOWING TYPE OF VERBIAGE
  • "A jobsite observation of the condition of the existing framing system was performed by an audit team of the installer as a request from PE."
  • The statement that the analysis is based on information provided by another party shall be removed from letter or the engineering firm shall do the site survey.
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
PV Breaker,Meter Adapter,Line Side Taps,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
75
De Rating Ampacity
1

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

The following is required for every planset including revised plans:

  • CHECKLIST
  • EXAMPLE PLANSET -----> EXAMPLE (or see "AURORA EXAMPLE PLANSET.pdf" in the files)
  • Provide photos of all sides of the house on the plans. Photos must be large enough for the reviewer to see details of the home. (see "Aurora Elevation Example.pdf" in the files)
  • Highlight which model of equipment we are using on the spec/cutsheets (see "AURORA EXAMPLE PLANSET.pdf" in the files)
  • EXISTING SYSTEMS: provide spec sheets for existing inverter with model highlighted.
  • SPEC SHEETS: Mark on the spec sheets the equipment that is being used per plans. Example: Ticket #2793452 (Plan Detail)
Roof Plan

For multiple story homes - Provide an elevation or photo of all sides of the house where the array will be installed to verify there will be no windows or doors within the 3 foot fire access points

Attachment Detail


Electrical Diagram

SEEB Projects: Utilize 100A AC Disconnect for 63A CHINT breaker.

Electrical Diagram Notes

All Jobs [ NEUTRAL AND GROUND TO BE BONDED AT FIRST DISCONNECTING MEANS // IMC OR RMC CONDUIT TO BE UTILIZED]

IMC OR RMC CONDUIT DO NOT UTILIZE EMT

Custom Placards Required
0
Non Standard Planset Requirements
Home Elevation
Non Standard Revision Requirements

HIGHLIGHT EQUIPMENT BEING UTILIZED ON SPEC SHEETS

Ground mount

Ground Mount Fencing Required
Mesh/Scrim