City of Decatur (IL)
NEC Code Version2017
Fire Code Version2015 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1
Codes
- NEC Code Version
- 2017
- Fire Code Version
- 2015 Building Code
- Code List
2017 NATIONAL ELECTRICAL CODE
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL EXISTING BUILDING CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL RESIDENTIAL CODE
2024 INTERNATIONAL BUILDING CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 1
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 85
- Snow Load
- 999
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Add Ground Snow and wind speed to calcs
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,PV Breaker,Meter Adapter,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 75
- De Rating Ampacity
- 0.91
- BOS Restrictions
- 312.5 c each cable requires clamp. unless all exceptions are met (all circuits need to be ran in their own conduit coming into the MSP)
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
- Remote disconnect required per 597167 when battery is located at back of home.
- AHJ inspector enforcing 3ft battery setbacks from openings/doors/windows.
- If 100A Main Breaker feeds to GW3, use #3 awg, #6 EGC in 1-1/4" conduit.
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Site
- Site Notes
All Jobs [Contractor shall verify smoke detection and CO detection meets State of Illinois law, or install per IRC 314 & 315.]
- Electrical Diagram
All Jobs [3ft battery setbacks required from openings/doors/windows.]
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- No