City of Macon (IL)

Illinois Authority Having Jurisdiction Solar permitting requirements

Spot something wrong?

These change with code cycles. If a requirement here is out of date or missing, tell us and we'll fix it.

Report a correction
NEC Code Version2014
Fire Code VersionN/A
Wet Stamps RequiredNone
Fire Setback EnforcedNo

Codes

NEC Code Version
2014
Fire Code Version
N/A
Code List

2012 INTERNATIONAL BUILDING CODE 2012 INTERNATIONAL MECHANICAL CODE 2012 INTERNATIONAL FUEL GAS CODE 2012 INTERNATIONAL FIRE CODE 2012 INTERNATIONAL ENERGY CONSERVATION CODE 2012 INTERNATIONAL EXISTING BUILDING CODE 2012 INTERNATIONAL RESIDENTIAL CODE 2014 NATIONAL FIRE PROTECTION AGENCY 2014 NATIONAL ELECTRICAL CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

Revision Required
No
New Planset Required For Module Swap
No

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
None
Structural Calculations Required
No

Fire setbacks

Fire Setback Enforced
No
Setback Notes


Structural & loads

Wind Speed
90
Snow Load
20
Reducible Snow Load Allowed
Yes
Max Attachment Spacing
96
Minimum Ground On Roof
#10

Electrical

AC Disconnect Required
No
Electrical Load Calcs Required
Derates
Allowed POI
Line Side Taps,Load Side Taps,Meter Adapter,PV Breaker
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
No
ESS Notes

Standard

Separate ESS Disconnect Required
No
ESS Elevation Detail Required
No

Plan set

Electrical Diagram


Custom Placards Required
No

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Macon (IL) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.