County of Dekalb (IL)
Codes
- NEC Code Version
- 2020
- Code List
2021 INTERNATIONAL RESIDENTIAL CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL FUEL GAS CODE
2020 NATIONAL ELECTRICAL CODE
2014 ILLINOIS STATE PLUMBING CODE
2021 IECC - ILLINOIS STATE ENERGY CONSERVATION CODE
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 2
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 0
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 90
- Wind Notes
Exposure Category B
- Snow Load
- 30
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Line Side Taps,Meter Adapter,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 1
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Electrical Diagram
Standard
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- No
- Ground Mount Notes
Setback Requirements 1). Set back requirements for all SES shall meet the structure minimum set back requirements when the SES is oriented at any & all positions. 2). No SES shall be allowed in the front yard of any residentially used or zoned property. 3). Roof mounted SES shall not extend beyond the exterior perimeter of the building on which the system is mounted. 4). The solar array and all components of the solar collector system in a Solar Farm shall be kept at least one hundred (100) feet from a property line or right-of-way. However, this requirement may be waived, provided the solar farm’s owner/lessee obtains, and records with the DeKalb County Recorder, signed and notarized affidavits, agreeing that the required minimum setback be waived, from all property owners and affected road authorities adjoining the zoning lot on which the solar farm is to be located (as determined by DeKalb County Community Development Department). However, in no instance shall any part of a solar farm, be located within fifty (50) feet of any of the aforementioned items. Ground screws allowed with engineering. Frost depth: 42" Septic Documentation: Health Department