County of McLean (IL)
Spot something wrong?
These change with code cycles. If a requirement here is out of date or missing, tell us and we'll fix it.
Report a correctionCodes
- NEC Code Version
- 2014
- Code List
2015 INTERNATIONAL BUILDING CODE
2015 INTERNATIONAL ENERGY CONSERVATION CODE
2015 INTERNATIONAL FIRE CODE
2015 INTERNATIONAL SOLAR ENERGY PROVISIONS AND ORDINANCE
2015 INTERNATIONAL RESIDENTIAL BUILDING CODE
2018 INTERNATIONAL ENERGY CONSERVATION CODE
2015 INTERNATIONAL SOLAR ENERGY PROVISIONS AND ORDINANCE 2014 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 1
- Revision Required
- No
- Rough Inspection
- None
- New Planset Required For Module Swap
- No
Stamps
- Ee Stamp Required On SLD
- No
- Structural Calculations Required
- No
Fire setbacks
- Fire Setback Enforced
- No
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 90
- Snow Load
- 20
- Reducible Snow Load Allowed
- Yes
- Max Attachment Spacing
- 96
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,Load Side Taps,PV Breaker,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- No
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Custom Placards Required
- No
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim
- Ground Mount Notes
Front: 60’ feet from the C/L of a township road or 30’ feet from the property line, whichever is greater. Side: 20’ feet Rear: 3’ feet, if entire structure is within 40’ feet of the rear property line the structure can be 3’ off of the side.
Need to provide distance from the ground mount to the septic tank and seepage field.
- Setback Back Yard
- 3
- Setback Side Yard
- 20