Village of Broadview (IL)
Codes
- NEC Code Version
- 2014
- Code List
2018 International Building Code (IBC) 2018 International Residential Code (IRC) 2018 International Energy Conservation Code(IECC) 2018 International Mechanical Code (IMC) 2018 International Fire Code (IFC) 2009 State of Illinois Plumbing code 2014 National Electrical code
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,MPU,MPU,Derate,Derate,Derate
- How Many Plansets Required
- 3
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
No setback required for code year. Would prefer 3' from Rake and 3' Along ridge
Structural & loads
- Wind Speed
- 90
- Wind Notes
Exposure Category B
- Snow Load
- 30
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Load Side Taps,Meter Adapter,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 1
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Maximum Number of Overcurrent Devices: Tandem Breakers / Fuse Sizes to be used . A panel board shall be provided with physical means to prevent the installation of more overcurrent devices than the number for which the panel board was designed, rated, and listed. A 2-pole circuit breaker shall be considered two overcurrent devices Add notes: Maximum Number of Overcurrent Devices: Tandem Breakers / Fuse Sizes to be used . A panel board shall be provided with physical means to prevent the installation of more overcurrent devices than the number for which the panel board was designed, rated, and listed. A 2-pole circuit breaker shall be considered two overcurrent devices Local inspector to field verify that proper grounding rods are connected to the ground bar in the utility meter and proper bonding from the street side of the water meter to the main service panel neutral bus. Local inspector to field verify that all PV system-mounting lag screws are properly fastened to the roof rafters / trusses. Local inspector to field verify that all interior and exterior conduit, enclosures, and disconnects are properly labeled and marked. A qualified Electrician, approved plans, this plan review, attic access and a ladder are required to be available on site at time of inspections.
- Electrical Diagram
For line side taps: Provide manufacturers cut sheets of connector/disconnects.
- Electrical Diagram Notes
the means of supply side tap complies with NEC 230.46 and 705.12(A).
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim