Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Village of Bull Valley (IL)

Illinois Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2014
Wet Stamps RequiredDigital Structural
Fire Setback Enforced0

Codes

NEC Code Version
2014
Code List
The 2018 International Building Code The 2018 International Residential Code The 2015 International Mechanical Code The 2015 International Fire Code The 2015 International Existing Building Code The 2015 International Property Maintenance Code The 2014 National Electrical Code The Illinois Energy Conservation Code, current edition T he Illinois State Plumbing Code, current edition The Illinois Accessibility Code, current edition B. Exceptions 1. All references to the International Plumbing Code shall b
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
1
Revision Required
0
New Planset Required For Module Swap
0

Stamps

Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
0
Setback Notes
Standard

Structural & loads

Wind Speed
110
Snow Load
30
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes
Standard
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
PV Breaker,Line Side Taps,Load Side Taps,Meter Adapter
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes
Standard
Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Village of Bull Valley (IL) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.