Village of East Galesburg (IL)

Illinois Authority Having Jurisdiction Solar permitting requirements

Spot something wrong?

These change with code cycles. If a requirement here is out of date or missing, tell us and we'll fix it.

Report a correction
Wet Stamps RequiredDigital Structural

Codes

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

Revision Required
No
New Planset Required For Module Swap
No

Stamps

Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified

Structural & loads

Wind Speed
108
Wind Notes

https://ascehazardtool.org/

Snow Load
38
Reducible Snow Load Allowed
Yes

Plan set

Custom Placards Required
No
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Village of East Galesburg (IL) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.