Village of Lombard (IL)
Codes
- NEC Code Version
- 2017
- Fire Code Version
- 2018 Building Code
- Code List
LOMBARD MUNICIPAL CODES, TITLE XV: LAND USAGE 2018 INTERNATIONAL ENERGY CONSERVATION CODE 2018 INTERNATIONAL BUILDING CODE 2018 INTERNATIONAL RESIDENTIAL CODE 2018 INTERNATIONAL FIRE CODE 2017 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 3
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
3' From Rake From eave to Ridge and 3' Along the Ridge, 3' from ALL hips. 18'' allowed from valleys
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category B
- Snow Load
- 30
- Snow Load Notes
30 PSF
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Use 2012 IBC in structural calculations
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Meter Adapter,Line Side Taps,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Modified setbacks are NOT allowed Roof access points shall be located in areas that do not require placement of ground ladder(s) over openings such as windows, doors, etc. and do not conflict with overhead obstructions such as tree limbs, wires, etc.
- Roof Plan
**-Modified setbacks are NOT allowed** **-Roof access points shall be located in areas that do not require placement of ground ladder(s) over openings such as windows, doors, etc. and do not conflict with overhead obstructions such as tree limbs, wires, etc.**
- Electrical Diagram
Standard
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim