Village of Milan (IL)
NEC Code Version2011
Fire Code Version2015 Building Code
Fire Setback Enforced1
Codes
- NEC Code Version
- 2011
- Fire Code Version
- 2015 Building Code
- Code List
2012 International Building Code
2012 International Existing Building Code
2012 International Resident Code
2012 International Mechanic Code
2012 International Fuel Gas Code
2012 International Fire Code
2012 International Property Maintenance Code
2012 International Energy Conservation Code
2012 International Plumbing Code, 2004 Illinois State Plumbing Code
2012 International Swimming Pool and Spa Code
2012 International Wildland - Interface Code
1997 Illinois Accessibility Code
2011 National Electric Code
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 0
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Structural Calculations Required
- Yes - Multiple Layer Shingle
Fire setbacks
- Fire Setback Enforced
- 1
Structural & loads
- Wind Speed
- 90
- Snow Load
- 20
- Reducible Snow Load Allowed
- 1
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,Meter Adapter,PV Breaker,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
Plan set
- Custom Placards Required
- 1
- Placards Notes
CUSTOM SITE MAP PLACARDS REQUIRED FOR MID AMERICA