Village of Riverwoods (IL)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2024 INTERNATIONAL BUILDING CODE
2024 INTERNATIONAL ENERGY CONSERVATION CODE
2024 INTERNATIONAL FIRE CODE
2024 INTERNATIONAL SOLAR ENERGY PROVISIONS AND ORDINANCE
2024 INTERNATIONAL RESIDENTIAL BUILDING CODE
2023 NATIONAL ELECTRICAL CODE
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 0
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Electrical,Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- N/A
Fire setbacks
- Fire Setback Enforced
- 1
Structural & loads
- Wind Speed
- 999
- Wind Notes
ASCE TOOL
- Snow Load
- 25
- Snow Load Notes
ASCE TOOL
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
STAMP ALL PAGES
- PE to provide firm number on stamp
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- No
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,PV Breaker,Line Side Taps,Load Side Taps
- Supply Tap Neutral Ground Bond Required
- 1
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
- BOS Restrictions
Standard
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
- Separate ESS Disconnect Required
- No
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Identify all conduit runs and junction boxes
- Cover Page
- Cover Page Notes
Need to put all corrections on the cover page when we receive revisions
All Jobs [HOME IS NOT EQUIPPED WITH FIRE SPRINKLERS // PROJECT FOLLOWS 2023 NEC & IRC 2024]
- Site
- Site Notes
All Jobs [HOME IS NOT EQUIPPED WITH FIRE SPRINKLERS // CONDUIT WILL BE RUN THROUGH ATTIC AS NEEDED]
- Roof Plan
- Roof Plan Notes
All Jobs [HOME IS NOT EQUIPPED WITH FIRE SPRINKLERS // CONDUIT WILL BE RUN THROUGH ATTIC AS NEEDED]
- Attachment Detail
- Electrical Diagram
- Electrical Diagram Notes
All Jobs [Equipment listings and spec sheets attached to plans // PROJECT FOLLOWS 2023 NEC // INSTALLER TO CONFIRM MAIN BREAKER OF EXISTING PANEL IS 22K AIC RATED. IF THIS IS NOT THE CASE, THE MAIN BREAKER TO BE REPLACED WITH NEW 200A, 22K AIC RATED BREAKER]
Battery [Relocated loads will need to be ARC FAULT PROTECTED]
- Label Page
- Label Page Notes
All Jobs [PROJECT FOLLOWS NEC 2023 & IRC 2024]
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- No
- Ground Mount Notes
Standard Ground Mount requirements
- Setback Front Yard
- 10
- Setback Back Yard
- 5
- Setback Side Yard
- 5