Village of Romeoville (IL)
NEC Code Version2020
Fire Code Version2015 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2015 Building Code
- Code List
2014 STATE OF ILLINOIS PLUMBING CODE
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL CONSERVATION CODE
2021 INTERNATIONAL FIRE CODE
2021 INTERNATIONAL FUEL GAS CODE
2021 INTERNATIONAL MECHANICAL CODE
2020 NATIONAL ELECTRIC CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 1
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Ridge Setback
- 36
- Rake Setback
- 36
- Hip Valley Setback
- 18
- Eave Setback
- 18
- Setback Notes
2015 IBC/IRC 3' Setback EVERY PROJECT - Add an 18 fire set back at the EAVE
ONLY 50% ARRAY COVERAGE ALLOWED
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category B
- Snow Load
- 30
- Reducible Snow Load Allowed
- 0
- Max Attachment Spacing
- 96
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates,Battery
- Allowed POI
- Load Side Taps,Line Side Taps,PV Breaker,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 75
- De Rating Ampacity
- 1
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
*702.4 Direction*
- AHJ Enforcing NEC 702.4 (Optional Standby Systems) for ESS Will require us to only backup essential loads whose total demand does not exceed what the # of Batteries can provide E.g., 1x Tesla PW3 can export 48A, and so the total load demand in backup cannot exceed 48A as shown on planset load calculations (standard and optional acceptable).
- Option 1: 702.4(B) EMS or Load Management Hardware Exception can be used in NEC 2020/2023 as to allow maximum capable backup loads (I.E.-SPAN).
- Option 2: 220.87(1) Exception: Load Calculation based on Utility Meter Demand Data (Green Button - 15 min Interval over a 30 day period.)
- Option 3: Load Calculations via Emporia Energy Monitoring (30 Day Period)
- Option 4: Downsize loads
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
ONLY 50% ARRAY COVERAGE ALLOWED
- Site Notes
All Jobs [AC disconnect is required within sight of the inverter]
- Electrical Diagram
- Electrical Diagram Notes
All Jobs [MINIMUM GROUNDING CONDUCTOR MUST BE #8 COPPER WIRE // ALL CONDUIT MUST BE RMC]
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim