Village of Roselle (IL)
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2020 NATIONAL ELECTRIC CODE WITH AMENDMENTS 2018 INTERNATIONAL RESIDENTIAL CODE WITH AMENDMENTS 2018 INTERNATIONAL BUILDING CODE WITH AMENDMENTS 2018 INTERNATIONAL MECHANICAL CODE WITH AMENDMENTS 2018 INTERNATIONAL FUEL GAS CODE WITH AMENDMENTS 2018 INTERNATIONAL FIRE CODE WITH AMENDMENTS 2014 ILLINOIS STATE PLUMBING CODE 2018 INTERNATIONAL ENERGY CONSERVATION CODE WITH AMENDMENTS 2018 INTERNATIONAL EXISTING BUILDING CODE WITH AMENDMENTS 2018 INTERNATIONAL SWIMMING POOL SPA CODE WITH AMENDMENTS 2018 NFPA 101 LIFE SAFETY CODE 2018 ILLINOIS ACCESSIBILITY CODE
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 3
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 90
- Wind Notes
Exposure Category B
- Snow Load
- 30
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,Load Side Taps,Line Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 1
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Provide a photo of the existing main service panel with the cover off. Provide a photo of the existing Com Ed meter, and where/how will the Distributed Generation System be connected. Indicate if and how any conduit to be run through the attic will be installed and secured
- Cover Page Notes
All Jobs [Photovoltaic Modules shall not be installed over any attic, plumbing or mechanical vent. Plumbing vents to extend a minimum of 12 inches above roof or modules. No building, plumbing or mechanical vents are to be covered, obstructed or routed around modules. // All wiring must be properly supported by devices or mechanical means designed and listed for such use. Wiring shall be permanently and completely held off of the roof surface. Wires shall be secured by cable ties, straps, hangers or similar fittings at intervals not exceeding 4.5 feet. Wires shall be secured within 12 inches of each box, cabinet, conduit body or other termination.]
- Electrical Diagram
Standard
- Electrical Diagram Notes
All Jobs [Any code violations to the existing electrical system (i.e., Grounding, Bonding, etc.) shall be brought into compliance prior to Solar System installation. A separate Permit may be required for the upgrade work. // Crimp on terminals shall be listed and installed using a listed tool specified for use in crimping those specific crimps // Twist on wire connectors shall be listed for the environment (i.e., wet, damp, etc.) and shall be installed per manufacturer’s installation instructions.]
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim