Village of Valmeyer (IL)
NEC Code Version2020
Wet Stamps RequiredDigital Structural
Fire Setback Enforced0
Codes
- NEC Code Version
- 2020
- Code List
2015 INTERNATIONAL BUILDING CODE
2015 INTERNATIONAL ENERGY CONSERVATION CODE
2015 INTERNATIONAL FIRE CODE
2015 INTERNATIONAL SOLAR ENERGY PROVISIONS AND ORDINANCE
2021 INTERNATIONAL RESIDENTIAL BUILDING CODE
2018 INTERNATIONAL ENERGY CONSERVATION CODE
2015 INTERNATIONAL SOLAR ENERGY PROVISIONS, AND ORDINANCE
2020 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- N/A
Fire setbacks
- Fire Setback Enforced
- 0
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 90
- Snow Load
- 20
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
SE stamps/SE calcs/PE letter
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Allowed POI
- Load Side Taps,PV Breaker,Line Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
AHJ doesn’t allow SEEB batteries to be installed outside, only Tesla batteries, due to SEEB having operational temperatures of 14 deg. while Tesla's is -4 deg.
- Interior ESS require fireproof drywall and taping added behind it and extending 4ft out from the ceiling.
- Heat detector is required
- RSD IMO added within line of sight of the meter
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Site
Ground mounted systems are not approved
- Roof Plan
If conduit will be run through the attic, rigid conduit is required. Roof top conduit runs do not need rigid conduit.
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- No
- Ground Mount Notes
Ground mounted systems are not approved
- Ground Mount Requires Soil Sample
- N/A