Village of Winfield (IL)
Codes
- NEC Code Version
- 2014
- Fire Code Version
- 2015 Building Code
- Code List
International Residential Code 2015 International Building Code 2015 International Existing Building Code 2015 National Electrical Code 2014 International Fire Code 2015 International Energy Conservation Code 2015
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 2
- Revision Required
- 0
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category B
- Snow Load
- 30
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,PV Breaker,Line Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Add notes: Local inspector to field verify proper access pathways are provided around the PV installation. Pathways shall be located in areas with minimal obstructions such as landscaping, conduit, or mechanical equipment. Local inspector to field verify that the Maximum Number of Overcurrent Devices does not exceed the number for which the Main panel board is designed, rated and listed. A 2-pole circuit breaker (Tandem Breakers) shall be considered two overcurrent devices. Local inspector to field verify that proper grounding rods (two rods) are connected to the ground bar in the utility meter and proper bonding from the street side of the water meter to the main service panel neutral bus. Local inspector to field verify that all PV system-mounting screws are properly fastened to the roof rafters / trusses. Local inspector to field verify that all interior and exterior conduit, enclosures, and disconnects are properly labeled and marked.
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim