Village of Wonder Lake (IL)

Illinois Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2021 International Residential Code

2023 National Electric Code

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
1
Revision Required
0
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified

Fire setbacks

Fire Setback Enforced
1
Setback Notes


Structural & loads

Wind Speed
90
Snow Load
20
Reducible Snow Load Allowed
1
Minimum Ground On Roof
#10

Electrical

Allowed POI
Line Side Taps,Load Side Taps,PV Breaker,Meter Adapter
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Plan set

Attachment Detail


Attachment Detail Notes

All Jobs [Flush Mount Solar Modules will not exceed 12in above roof]

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Ground Mount Notes

* Systems cannot exceed 12'6" in height * Systems cannot exceed 500 sq ft

Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Village of Wonder Lake (IL) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.