Town of Wenham (MA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
10TH EDITION OF THE MA STATE BUILDING CODE 780
2021 INTERNATIONAL BUILDING CODE W/780 CMR
2021 INTERNATIONAL RESIDENTIAL CODE W/780 CMR
2021 INTERNATIONAL EXISTING BUILDING CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL FIRE CODE
2023 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 3
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Ee Stamp Notes
- No EE required
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 125
- Wind Notes
Exposure Category B
- Snow Load
- 50
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,PV Breaker,Meter Adapter,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Cover Page
Please add phone number to plans
Submittal process clarified concerning the fire department.
Plans need to show 3 phone numbers
- One for emergency (live person)
- one for Service and
- one customer service
- Label Page
(SEE FILES SECTION FOR THIS LABEL)
- Installer information label required on labels page.
- "A label shall be installed adjacent to the main disconnect indicating the name and emergency telephone number of the company currently servicing the PV system", per AHJ.
- Phone numbers to automated response systems do NOT satisfy this requirement.
- Must edit phone number to show "staff "
- Label Page Notes
Please add phone number to plans
Submittal process clarified concerning the fire department.
Plans need to show 3 phone numbers
- One for emergency (live person): staff
- one for Service : staff
- one customer service : (
BM contact information must be listed as Emergency contact on labeling plan. staff (SEE FILES SECTION FOR THIS LABEL)
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim