Town of Greene (ME)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
MAINE UNIFORM BUILDING AND ENERGY CODE
2021 INTERNATIONAL RESIDENTIAL CODE
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL EXISTING BUILDING CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL MECHANICAL CODE
2023 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Ee Stamp Notes
Town of Greene ME need to have an engineer stamp/signature in all pages, specially on page 4 of the plan to verify structural integrity of the roof.
Fire setbacks
- Fire Setback Enforced
- 1
- Rake Setback
- 3
- Setback Notes
must maintain 3ft along rake. 3ft pathway from eave to ridge located elsewhere does not work. 3' setback on both sides of array. two 3' paths per mounting plane. 36 inches on BOTH EDGES and the Ridge.
Structural & loads
- Wind Speed
- 115
- Snow Load
- 80
- Reducible Snow Load Allowed
- 1
- Structural Notes
Town of Greene ME need to have an engineer stamp/signature in all pages, specially on page 4 of the plan to verify structural integrity of the roof.
- Minimum Ground On Roof
- #10
Electrical
- Allowed POI
- Line Side Taps,Meter Adapter,Load Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim