Charter Township of Clinton (MI)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2021 MICHIGAN BUILDING CODE
2015 MICHIGAN RESIDENTIAL CODE
2021 MICHIGAN REHABILITATION CODE
2021 MICHIGAN MECHANICAL CODE
2021 MICHIGAN RESIDENTIAL ENERGY CODE
2015 MICHIGAN ENERGY CODE
2023 NATIONAL ELECTRICAL CODE
2023 MICHIGAN ELECTRICAL CODE
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 1
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Top Right
- Date On Stamps
- Date Plans are Stamped
Fire setbacks
- Fire Setback Enforced
- 1
Structural & loads
- Wind Speed
- 108
- Wind Notes
https://ascehazardtool.org/
- Snow Load
- 35
- Snow Load Notes
https://ascehazardtool.org/
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- No
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,PV Breaker,Load Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Supply Tap Neutral Ground Bond Required
- 1
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
- BOS Restrictions
Standard
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
For all ESS projects:
- Include Installation details in cutsheets.
ESS Location Shown
- Site/Roof plan: Show exact location of the Energy Storage System (inside or on building).
- Example: Mounted on the interior garage wall adjacent to the main electrical panel. (Common because garages offer separation from living spaces and easy access for installers/first responders.)
Fire-Rated Assembly Details
- Site/Roof plan: Indicate fire-resistance rating and how the ESS is protected (walls, barriers, etc.)
- Example: ESS installed behind a 1-hour fire-rated drywall assembly on the garage side of the house (e.g., 5/8" Type X gypsum board on the shared wall between garage and living space). Show how the ESS maintains required clearance from combustible surfaces per code.
Materials Specified
- Site/Roof plan: List all proposed materials for the fire-rated assembly and adjacent construction.
- Example: 5/8" Type X gypsum board, fire-rated sealant at penetrations, metal mounting bracket rated for the ESS weight, and non-combustible backing panel. List manufacturer/model if required.
Ventilation Design (if needed)
- Site/Roof plan: State "No Ventilation needed for ESS system"
- Example: Passive ventilation via louvered vent in garage door plus a small wall-mounted exhaust fan tied to a temperature sensor to activate if battery temperature exceeds threshold (for systems that specify off-gassing or heat concerns). Show intake and exhaust locations and airflow path.
Smoke/Heat Detection/Alarm Provisions
- Site/Roof plan: State "Home is equipped with smoke and carbon monoxide detectors"
- Example: Heat detector mounted on the ceiling above the ESS location in the garage, tied into the home’s existing alarm panel or standalone audible alarm if not interconnected. Include a smoke detector in the vicinity per local code.
AHJ will not allow exterior wall mount if exterior wall is made of brick.
- Separate ESS Disconnect Required
- No
- ESS Elevation Detail Required
- Yes
Plan set
- Plan Set Requirements
Standard
- Cover Page
Standard
- Cover Page Notes
- Site
For all ESS projects:
- Include Installation details in cutsheets.
ESS Location Shown
- Site/Roof plan: Show exact location of the Energy Storage System (inside or on building).
- Example: Mounted on the interior garage wall adjacent to the main electrical panel. (Common because garages offer separation from living spaces and easy access for installers/first responders.)
Fire-Rated Assembly Details
- Site/Roof plan: Indicate fire-resistance rating and how the ESS is protected (walls, barriers, etc.)
- Example: ESS installed behind a 1-hour fire-rated drywall assembly on the garage side of the house (e.g., 5/8" Type X gypsum board on the shared wall between garage and living space). Show how the ESS maintains required clearance from combustible surfaces per code.
Materials Specified
- Site/Roof plan: List all proposed materials for the fire-rated assembly and adjacent construction.
- Example: 5/8" Type X gypsum board, fire-rated sealant at penetrations, metal mounting bracket rated for the ESS weight, and non-combustible backing panel. List manufacturer/model if required.
Ventilation Design (if needed)
- Site/Roof plan: State "No Ventilation needed for ESS system"
- Example: Passive ventilation via louvered vent in garage door plus a small wall-mounted exhaust fan tied to a temperature sensor to activate if battery temperature exceeds threshold (for systems that specify off-gassing or heat concerns). Show intake and exhaust locations and airflow path.
Smoke/Heat Detection/Alarm Provisions
- Site/Roof plan: State "Home is equipped with smoke and carbon monoxide detectors"
- Example: Heat detector mounted on the ceiling above the ESS location in the garage, tied into the home’s existing alarm panel or standalone audible alarm if not interconnected. Include a smoke detector in the vicinity per local code.
- Roof Plan
Standard
- Attachment Detail
Standard
- Electrical Diagram
Standard
- Label Page
Standard
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- No
- Ground Mount Notes
Standard Ground Mount requirements
- Setback Front Yard
- 10
- Setback Back Yard
- 5
- Setback Side Yard
- 5