City of Joplin (MO)
NEC Code Version2017
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1
Codes
- NEC Code Version
- 2017
- Fire Code Version
- 2018 Building Code
- Code List
2018 INTERNATIONAL BUILDING CODE WITH LOCAL AMENDMENTS
2018 INTERNATIONAL PLUMBING CODE WITH LOCAL AMENDMENTS
2018 INTERNATIONAL MECHANICAL CODE WITH LOCAL AMENDMENTS
2018 INTERNATIONAL FUEL GAS CODE WITH LOCAL AMENDMENTS
2018 INTERNATIONAL FIRE CODE WITH LOCAL AMENDMENTS
2018 INTERNATIONAL EXISTING BUILDING CODE WITH LOCAL AMENDMENTS
2018 INTERNATIONAL RESIDENTIAL CODE WITH LOCAL AMENDMENTS
2017 NATIONAL ELECTRICAL CODE WITH LOCAL AMENDMENTS
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
Fire setbacks
- Fire Setback Enforced
- 1
Structural & loads
- Wind Speed
- 115
- Wind Notes
https://ascehazardtool.org/
- Snow Load
- 30
- Snow Load Notes
https://ascehazardtool.org/
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
AHJ requires SE on all roof-mounted projects.
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- No
- Electrical Load Calcs Required
- All Jobs
- Allowed POI
- Load Side Taps,PV Breaker,Line Side Taps,Meter Adapter
- Supply Tap Neutral Ground Bond Required
- 1
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
- BOS Restrictions
Standard
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard ESS Requirements
- Separate ESS Disconnect Required
- No
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Standard
- Cover Page
Standard
- Site
Standard
- Roof Plan
Standard
- Attachment Detail
Standard
- Electrical Diagram
Standard
- Label Page
Standard
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- No
- Ground Mount Notes
Standard Ground Mount requirements
- Setback Front Yard
- 10
- Setback Back Yard
- 5
- Setback Side Yard
- 5