County of Polk (NC)
NEC Code Version2017
Fire Code Version2018 Building Code
Wet Stamps RequiredWet Structural
Fire Setback Enforced1
Codes
- NEC Code Version
- 2017
- Fire Code Version
- 2018 Building Code
- Code List
2018 NORTH CAROLINA STATE BUILDING CODE 2018 NORTH CAROLINA STATE RESIDENTIAL CODE 2018 NORTH CAROLINA STATE EXISTING BUILDING CODE 2018 NORTH CAROLINA STATE ELECTRICAL CODE 2018 NORTH CAROLINA STATE FIRE CODE 2018 NORTH CAROLINA STATE STATE CODE 2018 NORTH CAROLINA ADMINISTRATIVE CODE AND POLICIES 2017 NATIONAL ELECTRIC CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- Wet Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
3ft setbacks at eaves, hips, rakes, valleys, and ridges.
Structural & loads
- Wind Speed
- 115
- Snow Load
- 20
- Snow Load Notes
Ground Load: 15 lbs/sq ft Roof Load: 20 lbs/sq ft
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Line Side Taps,Meter Adapter,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim