Borough of Dunellen (Middlesex County) (NJ)
Spot something wrong?
These change with code cycles. If a requirement here is out of date or missing, tell us and we'll fix it.
Report a correction NEC Code Version2020
Fire Code Version2018 Building Code
Wet Stamps RequiredWet Structural
Fire Setback EnforcedYes
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL RESIDENTIAL CODE
2021 INTERNATIONAL FIRE CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL EXISTING BUILDING CODE
2021 INTERNATIONAL FUEL GAS CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL PLUMBING CODE
2020 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 2
- Revision Required
- Yes
- New Planset Required For Module Swap
- Yes
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Wet Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- Yes
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 85
- Snow Load
- 999
- Reducible Snow Load Allowed
- Yes
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Allowed POI
- Line Side Taps,PV Breaker,Meter Adapter,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- No
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Electrical Diagram
If lineside tap (LST), then a Hoffman Tap Box (junction box) is required.
- Custom Placards Required
- No
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim