Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Pleasantville (Atlantic County) (NJ)

New Jersey Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2020
Fire Code Version2018 Building Code
Wet Stamps RequiredWet Structural
Fire Setback Enforced1

Codes

NEC Code Version
2020
Fire Code Version
2018 Building Code
Code List

2021 INTERNATIONAL BUILDING CODE NJ EDITION

2021 INTERNATIONAL RESIDENTIAL CODE NJ EDITION

2021 INTERNATIONAL FIRE CODE NJ EDITION

2021 INTERNATIONAL ENERGY CONSERVATION CODE NJ EDITION

2021 INTERNATIONAL EXISTING BUILDING CODE NJ EDITION

2021 INTERNATIONAL FUEL GAS CODE NJ EDITION

2021 INTERNATIONAL MECHANICAL CODE NJ EDITION

2021 INTERNATIONAL PLUMBING CODE NJ EDITION

2020 NATIONAL ELECTRICAL CODE NJ EDITION

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
2
Revision Required
0
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Wet Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
122
Wind Notes

Exposure Category B

Snow Load
20
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

**Raised seal required for (2) plans.** SE raised seal stamps on corresponding PV pages & PE Letter / Calcs. WS: 122mph. Exposure Category B. SL: 20lbs. Send 2 copies 201 Commerce Dr Ste. 5 Moorestown, NJ 08057 2018 NJ International Building Code must be shown on Engineering

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Line Side Taps,Load Side Taps,Meter Adapter,PV Breaker
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91
BOS Restrictions

We need to show all line side connections in a tap box.

No piercing connection in this township

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
No
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

Electrical load calcs required for ALL projects. (even for MPU)

Electrical Diagram

If lineside tap (LST), then a Hoffman Tap Box (junction box) is required.

Electrical Diagram Notes


Custom Placards Required
1

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Pleasantville (Atlantic County) (NJ) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.