Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Reno (NV)

Nevada Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Electrical,Digital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2024 INTERNATIONAL BUILDING CODE

2024 INTERNATIONAL RESIDENTIAL CODE

2024 INTERNATIONAL EXISTING BUILDING CODE

2024 INTERNATIONAL ENERGY CONSERVATION CODE

2024 INTERNATIONAL FUEL GAS CODE

2024 INTERNATIONAL MECHANICAL CODE

2024 UNIFORM PLUMBING CODE

2024 UNIFORM MECHANICAL CODE

2023 NATIONAL ELECTRICAL CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
2
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Digital Electrical,Digital Structural
Structural Calculations Required
Yes
Ee Stamp Notes

Center-fed panels require EE stamp on SLD

Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
120
Wind Notes

Exposure Category C

Snow Load
999
Snow Load Notes

Double check elevation and snow load here: https://ascehazardtool.org/

Project West of Highway 95:

  • Elevation 4500 - snow load 30
  • Elevation 5000 - snow load 30
  • Elevation 5100 - snow load 41
  • Elevation 5200 - snow load 52
  • Elevation 5300 - snow load 64

Project East of Highway 95:

  • Elevation 4500 - snow load 30
  • Elevation 5000 - snow load 30
  • Elevation 5100 - snow load 31
  • Elevation 5200 - snow load 33
  • Elevation 5300 - snow load 34
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes
  • BATTERY PROJECTS REQUIRE CALCS OF MOUNTING ON WALL FOR ESS
  • The seal must include the signature, expiration date and date which seal was signed
  • Structural Engineer’s Stamp must be dated in accordance with the State of Nevada Engineer’s Board
  • Ensure structural calcs DO NOT reference ASCE 7-10 on pages 4 and 5. Structural calcs need to cite ASCE 7-16
  • Engineer to evaluate attachment requirements (lag screws) and specify minimum size and embedment
  • PE calcs must provide calculations for the anchorage (lag screws)
  • PE calcs must include seismic analysis
  • Structural calculations and plans must be stamped by the same structural engineer. This includes revisions.
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
All Jobs
Allowed POI
PV Breaker,Meter Adapter
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96
BOS Restrictions

No taps allowed

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Powerwall weight on struc. calcs

Revise Engineer’s structural calculations to include assessing the exterior wall for the weight of the Powerwall 3 and specifying anchorage.

Separate ESS Disconnect Required
Local Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

ALL JOBS

  • Provide manufacturer's span tables for attachment system
  • Spec sheet required for panel upgrades

EV CHARGERS:

  • Separate PV and EV charger plan sets required for this AHJ
Cover Page

ALL JOBS

  • Include wind speed and the snow load (PROJECT SPECIFIC)
  • Include a total project cost <--- This information can be found in lightspeed
  • The title block must include the contractor's license limit amount: $225,000

VICINITY MAP

  • MUST be black and white line drawing. Follow steps below to generate this:
  • Follow this link: https://snazzymaps.com/build-a-map
  • 1. Style: Under "Style" click "choose a Snazzy maps style". Then type "lines" in the search bar that appears and select the first option. Then hit "apply style".
  • 2. Size & Location: Click the pencil icon. Under "Center Location", click the green text that states "Or search for a location". Enter the site address. Click "apply changes".
  • 3. Markers: click on "Add your first marker". Under "Location", click the green text that states "Or search for a location". Enter the site address and hit "apply changes".
  • 4. Zoom in to the map until only the site and the nearest cross streets are showing. Take a snip of this image to use as the vicinity map. DO NOT use the save image feature from the website. Doing so will cause the site to ask the user to register for an account.
Site
  • Show Dimensions from the house to property lines. Label any accessory structures.
  • Include street names on the site plan.
Electrical Diagram

ALL JOBS

  • Plans must include pictures of the MSP for all jobs. Be sure that this page is included in the table of contents.
  • Include a red arrow on the pictures of the main service panel indicating where the PV breaker will be installed

EXISTING SYSTEMS

  • Must combine POI for (N) and (E) system
Custom Placards Required
0
Placards Notes

Yes, per code with exposure to the sun.

Non Standard Revision Requirements
  • Do not rev cloud changes on plans if the permit has not been submitted yet. Rev clouds will still be needed for any revisions to the plans after the permit has been submitted for the first review. 
  • All changes to plans are required to be clouded with a Delta indicating the revision number and date the change was made.
  • Revision letter must be detailed, cannot submit revision letters that only state "layout changed" or similar.
  • A response letter, addressing all comments, must be submitted. The letter needs to list the hold comments and respond to the hold comments made by the building department.
  • Only respond to the current hold comments made. Remove the 1st round of hold comments from the letter.
  • If you are adding revision to the response letter, please add that under the response to the hold comments. Add a header of REVISION and list the revision under that.
  • The letter must be submitted in PDF format.
  • All other documents have been accepted. Do NOT upload again.

Ground mount

Ground Mount Fencing Required
Situational
Ground Mount Notes

AHJ does not accept Nuance, Iron Ridge ONLY

Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Reno (NV) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.