County of Nye / Town of Pahrump (NV)
Codes
- NEC Code Version
- 2017
- Fire Code Version
- 2018 Building Code
- Code List
2018 INTERNATIONAL BUILDING CODE
2018 INTERNATIONAL RESIDENTIAL CODE
2018 INTERNATIONAL ENERGY CONSERVATION CODE
2018 UNIFORM PLUMBING CODE
2018 UNIFORM MECHANICAL CODE
2018 INTERNATIONAL PROPERTY MAINTENANCE CODE
2018 UNIFORM SWIMMING POOL, SPA, AND HOT TUB CODE
2017 NATIONAL ELECTRICAL CODE
2018 INTERNATIONAL FIRE CODE
2018 UNIFORM CODE FOR SOLAR ENERGY
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 1
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- None
- Structural Calculations Required
- No
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Only 18" setback from ridge is required if other side of ridge is not utilized for solar
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category C
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,PV Breaker,Load Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.87
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
PM optional. Inv > PM > AC > POI No published information about battery placement.
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
If applicable: plot plan needs the 4 setbacks for all existing (house, septic, well) added to the plot plan page
MPU PROJECTS:
- When an MPU will be on a pedestal there must be a separate plan set created to permit the MPU apart from the solar. Distances from property lines and structures from the MSP must be shown on the site plan.
DETACHED (N) EXTERIOR SUBPANEL (SAME AS MPU)
EV Chargers:
- Cover Page
Provide property acreage, proposed area of disturbance (array square footage), and the total linear feet of trenching (where trenching will be employed).
- Attachment Detail
Projects with rafter/structural upgrades must provide ridge size, rafter size, length, and spacing details.
- Electrical Diagram
CEC rating needs to be calculated and shown on SLD. Here is the formula for the CEC-AC rating: PTC Rating x Number of Panels x Inverter Efficiency = CEC-AC Rating
- Custom Placards Required
- 0
- Non Standard Planset Requirements
- Single Line Diagram
- Non Standard Revision Requirements
Please RED cloud and delta sign any changes made to the plans and provide the revision letter for the changes made.
Ground mount
- Ground Mount Fencing Required
- No
- Ground Mount Notes
- Added the Zoning application for the ground Mounts system for NYE County.
- A plot plan to scale; (applicant must show entire area of disturbance on the plot plan)
- Zoning and Dust Application are required ~~for the DCR team to fill out~~ , the rest of the permit coordinator takes care of it before submitting it.
- Show Rear, Front, Left, and Right property setbacks
- Show setback to street
- Must show distance from GM system to all existing structures on the property.
- Show total acreage of property
- Show total linear feet of trenching, if applicable
- If fence is included, show height on plans
- Show sq footage of array, include entire area enclosed by fence, if applicable
- A directional arrow indicating north on the plot plan;
- All development, both existing and proposed;
- Setbacks and property dimensions;
- Distances between all structures;
- Street names of streets adjacent to the subject property;
- Easements with locations and dimensions;
- Driveway location and an encroachment permit, if applicable, in accordance with title 12, chapter 12.08, "Excavations And Encroachments", of this Code
- Existing and proposed rights-of-way