City of Dublin (OH)
NEC Code Version2023
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced0
Codes
- NEC Code Version
- 2023
- Code List
2024 OHIO BUILDING CODE (2021 IBC)
2019 RESIDENTIAL CODE OF OHIO (2018 IRC)
2024 OHIO EXISTING BUILDING CODE (2021 IEBC)
2023 OHIO ELECTRIC CODE (2023 NFPA 70)
2021 INTERNATIONAL FIRE CODE (IFC)
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Restriction Notes
- AHJ does not allow solar panels on front of residence. Must apply for variance with AHJ if wish to have panels on front of residence.
- How Many Plansets Required
- Other (See Submission Notes)
- Revision Required
- 0
- Rough Inspection
- Rough Electrical
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 0
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Snow Load
- 20
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,PV Breaker,Load Side Taps,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
AHJ states panels CAN NOT face the street on any home. AHJ does not allow solar panels on front of residence. Must apply for variance with AHJ if wish to have panels on front of residence.
- Dublin Zoning Code 153.074 (E)(1)(c) Building Roof Mounted Equipment Building or roof-mounted equipment is permitted to the front of a principal or accessory only when it is demonstrated that this location provides the greatest efficiency of energy production Provide documentation that the panel location shown provides the greatest efficient of energy production.
- Roof Plan
- Dublin Zoning Code 153.074 (E)(1)(a) General provisions Solar energy equipment shall be a similar color and minimize gaps within the panels. White or grey grid lines on solar energy equipment are not permitted. Framing shall also be a color similar with the solar energy equipment, preferable a black, blue or similar color. Provide solar panel specification sheet
- Dublin Zoning Code 153.074 (E)(1)(c) Building Roof Mounted Equipment For pitched roofs, roof-mounted solar equipment shall be installed in a rectangular shape to avoid complex and nonsymmetrical configurations Revise layout so it’s a rectangular shape.
- Dublin Zoning Code 153.074 (E)(1)(c) Building Roof Mounted Equipment For pitched roofs, roof-mounted solar equipment shall be a color that is similar to the roof color Provide documentation of roof color
- Electrical Diagram
Projects that have a SolarEdge inverter do NOT require a J-Box
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim