City of Baker City (OR)
NEC Code Version2023
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced0
Codes
- NEC Code Version
- 2023
- Code List
2022 OREGON STRUCTURAL SPECIALTY CODE
2021 OREGON RESIDENTIAL SPECIALTY CODE
2025 OREGON ENERGY EFFICIENCY SPECIALTY CODE
2023 OREGON ELECTRICAL SPECIALTY CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 1
- New Planset Required For Module Swap
- 1
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Top Right
- Date On Stamps
- Date Plans are Stamped
Fire setbacks
- Fire Setback Enforced
- 0
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 999
- Snow Load
- 999
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Minimum Ground On Roof
- #10
Electrical
- Allowed POI
- Load Side Taps,PV Breaker,Line Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Cover Page
Residential Roof mount solar photovoltaic checklist
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim