City of Corvallis (OR)
NEC Code Version2023
SolarAPP+ StatusTargeted
Fire Setback Enforced0
Codes
- NEC Code Version
- 2023
- Code List
2022 OREGON MECHANICAL SPECIALTY CODE
2022 OREGON STRUCTURAL SPECIALTY CODE
2021 OREGON RESIDENTIAL SPECIALTY CODE
2023 OREGON ELECTRICAL SPECIALTY CODE
2025 OREGON ENERGY EFFICIENCY SPECIALTY CODE
2021 OREGON PLUMBING SPECIALTY CODE
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- Revision Required
- 1
- New Planset Required For Module Swap
- 1
Fire setbacks
- Fire Setback Enforced
- 0
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 999
- Snow Load
- 25
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 48
- Structural Notes
- link
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,Load Side Taps,Line Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Do not red cloud plans until the permit has been submitted for the first time
- Attachment Detail
Attachments shall be spaced not greater than 24 inches (609.6 mm) on center in any direction where:
- Ground snow loads exceed 36 psf (1.197 kN/m2).
- Located within 3 feet (914 mm) of a roof edge, hip, eave or ridge.
- Located in wind Exposure Category B or greater and the wind speed exceeds 120 mph.
- Located in wind Exposure Category C or greater and the wind speed exceeds 110 mph.
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim