- NEC Code Version
- 2023
- Code List
2021 OREGON RESIDENTIAL SPECIALTY CODE
2019 OREGON STRUCTURAL SPECIALTY CODE
2019 OREGON MECHANICAL SPECIALTY CODE
2021 OREGON PLUMBING SPECIALTY CODE
2025 OREGON ENERGY EFFICIENCY SPECIALTY CODE
2023 OREGON ELECTRICAL SPECIALTY CODE
2021 OREGON ENERGY EFFICIENCY SPECIALTY CODE
2019 OREGON ZERO ENERGY READY COMMERCIAL CODE
2019 OREGON FIRE CODE
2010 OREGON MANUFACTURED DWELLING INSTALLATION SPECIALTY CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 0
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 85
- Snow Load
- 999
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 48
- Structural Notes
Presprivtive Application must be filled out for every project. Pv plans need stamps, we also need Engineer letter/calcs no EE Stamp Required on SLD
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,Meter Adapter,PV Breaker,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
PRESCRIPTIVE CHECKLIST MUST BE FILLED OUT FOR EVERY PROJECT REGARDLESS OF ELIGIBLE OR NOT.
- Attachment Detail
Attachments shall not be spaced greater than 24 inches (609.6 mm) on center in any direction where:
- Ground snow loads exceed 36 psf (1.197 kN/m2).
- Located within 3 feet (914 mm) of a roof edge, hip, eave, or ridge.
- Located in wind Exposure Category B or greater, and the wind speed exceeds 120 mph.
- Located in wind Exposure Category C or greater, and the wind speed exceeds 110 mph.
Ground mount
- Ground Mount Fencing Required
- No